Road Name Change—SET PUBLIC HEARING
In accordance with NCGS 153A-239.1, a public hearing should be scheduled for the March 20, 2023, County Commission meeting to consider and receive comment for the following road name requests:
1. Currently Known As: N/A
Proposed Name: Brownstone Dr
Location: driveway that connects to Jim Neely Rd in the 100 block and then connects to SR601 US 601 Hwy in the 7400 block.
Property Owners: The Equity Group
Reason for Change: change in addressing ordinance requires all campground sites to have an individually numbered address and for all roads to be named.
2. Currently Known As: N/A
Proposed Name: Tulip Rd
Location: driveway that connects to Bull Hill Rd in the 100 block and then connects Jim Neely Rd in the 100 block.
Property Owners: The Equity Group
Reason for Change: change in addressing ordinance requires all campground sites to have an individually numbered address and for all roads to be named.
Schedule public hearing for the naming of Brownstone Drive and Tulip Road for the March 20, 2023 County Commissioners Meeting.
|